Concept Evolution


To the left is an early conceptual schematic of the design properties our alternative fueling station will encompass.


To the right is a Pro-E conceptual drawing of what Team Tank-Ups final design may resemble. This is an exploded assembly view of the basic cart frame which will be used to house the operating components.


To the left is another Pro-E drawing of what the user may encounter as an interface to operate the fueling station as a whole.


Photo of the first prototype of the water side. This mock up helped us verify the operation of the flow controllers on our system as well as possible system component configuration.




Above is a photo of the Alcohol Water Fueling Station upon completion.

The final product decreased total mixing/fueling time from approximately 1.25 hours to approximately 10 minutes. Verification can be done inline before fueling, or setup as a "stand alone" testing instrument for smaller batches of fuel.